AC and DC chargers
AC for vehicles parked for hours, DC where turnaround matters. The mix follows how long cars stay.
New Ability Energy
Eight services, one contract
The record
Three recent jobs across NSW, with the generation, saving and payback figures published in full.
See the projectsAC and DC charging specified against the site's existing capacity, with the switchboard work that makes it possible held by the same team.
AC and DC charging for fleets, staff carparks and common property, specified against the site's existing capacity rather than bolted on and hoped for. The switchboard work that makes it possible is ours as well, which is usually where these projects actually stall.
AC for vehicles parked for hours, DC where turnaround matters. The mix follows how long cars stay.
Fleet depots, staff carparks and customer bays each need their own access, billing and load settings.
Chargers on common property can be metered and billed back, so each lot pays for its own charging.
The supply is measured first. Load management then shares it across bays, so the site avoids an upgrade it does not need.
Indicative ranges. Your supply capacity and parking pattern set the real numbers.
Typical range on a commercial site
Indicative ranges for scoping only, not measurements from a specific job.
On a real job: 99.88 kW across the rooftops at Valentine Sports Park
Spare capacity at the switchboard and the connection is measured before any charger is chosen.
How long vehicles stay decides AC or DC, and how many bays need power at once.
Cabling, sub-boards and any upgrade are done by the team that installs the chargers.
Chargers are tested, access and billing are set up, and load management is tuned to the site.
It depends on the spare capacity at the switchboard and the connection. We measure it first, and load management often lets more bays share the same supply.
AC suits vehicles parked for hours, like staff cars and fleets overnight. DC suits quick turnaround. Most sites need mostly AC.
Yes, with the owners corporation's approval. The chargers can be metered so each lot pays for its own charging.
Scope creep on an energy job usually starts at the switchboard, and usually after the solar contractor has left site. What splitting the scope…
Read TechnicalAn energy charge bills the kilowatt hours a site used. A demand charge bills the single highest interval it reached. They respond to different…
Read GeneralThe panels on two competing proposals are usually similar. What differs is who is accredited, who holds the contract, who honours each warranty and…
ReadParking times, fleet size and a look at the switchboard are enough to specify a rollout.
Residential quote Commercial quote 1300 152 966
4.8 out of 5, from 100 Google reviews · 30+ licensed electricians and SAA accredited installers on our own books