Split systems and heat pumps
Supply, circuits and protection for split systems and heat pumps, installed alongside the rest of the electrical work.
New Ability Energy
Eight services, one contract
The record
Three recent jobs across NSW, with the generation, saving and payback figures published in full.
See the projectsPlant load measured before anything is sized, and run off site generation wherever it earns its keep.
Electrical works for heating, cooling and pump plant across the site. Plant is a large share of most commercial load, which is why it is measured before anything is sized, and why it is often the first thing that should run off the array.
Supply, circuits and protection for split systems and heat pumps, installed alongside the rest of the electrical work.
Dedicated supplies and controls for pump sets, sized to the motor and its starting load.
What the plant actually draws is measured before a replacement or a new supply is sized.
Plant that runs in daylight is scheduled onto the solar output, where the saving justifies the controls.
Indicative ranges. Measurement on your own plant replaces them.
Typical range on a commercial site
Indicative ranges for scoping only, not measurements from a specific job.
On a real job: 99.88 kW across the rooftops at Valentine Sports Park
The actual draw of heating, cooling and pumps is measured, not read off the nameplate.
Circuits, protection and controls are sized to that measurement and to the starting loads.
The electrical work is done by the contractor already on site, under one contract.
Where there is solar on site, daytime plant is scheduled to run from it.
Yes, alongside the electrical work, with the supply and protection each unit needs.
Nameplate ratings rarely match what plant actually draws. Measuring first avoids oversizing the new unit and its supply.
Where they run in daylight, yes. Scheduling them onto the array's output uses more of the solar on site instead of exporting it.
Load removed from a site needs no roof, no connection and no inverter. It works at night, it cannot be curtailed, and it makes every system that…
Read TechnicalAn energy charge bills the kilowatt hours a site used. A demand charge bills the single highest interval it reached. They respond to different…
Read ESG & SustainabilityScope 2 counts the electricity a site buys. Generation used on site cuts that number directly. Generation sent back out never entered it, and the…
ReadA walk through the plant room and your interval data are enough to start.